The ePIC E0-E1 Interface

The E0-E1 interface is the boundary between Echelon 0 — the ePIC detector and its data acquisition system (DAQ), the domain of the experimental facility — and Echelon 1, the host-laboratory computing domain at BNL and JLab. It is where streaming data, datataking state, and operational control pass between the detector world and the computing world, and where workflow management system (WFMS) responsibility begins.

This document states the interface as understood in mid 2026: the agreed architecture, the definitions and mechanisms in hand, the working realization in the streaming workflow testbed, and the open questions and development path. It is prepared as input to the formalization of the interface in the ePIC Streaming Computing Model report (target September 2026, set at the July 2026 collaboration meeting) and to the October 2026 ePIC Software and Computing review. The previous review identified the E0-E1 interface as a key risk: a streaming experiment depends critically on this interface, and streaming experiments are recent enough in nuclear and particle physics that the territory is not well trodden.

The questions presented at the July 2026 joint Streaming DAQ and Computing workfest are the working agenda for the formalization:

  • Raw-data and super time frame definitions and timeline
  • Evolution of the state model and transition rules
  • Latency requirements
  • Calibration and conditions databases
  • Information and control interfaces between E0 and E1
  • AI readiness and AI-enabled control

These questions map closely onto the elements catalogued in the January 2026 interface notes, which remain the reference inventory. The sections below cover the architecture and the Echelon 0 context first, then the question areas in turn.

Architecture

The DAQ is one system spanning two facilities: the DAQ room at IP6 and the DAQ enclave in the BNL data center, connected at 4 Tbps. Time frames are built into super time frames in the enclave, and the files land in the DAQ exit buffer, sized for about 72 hours of datataking. The buffer extends onto an external subnet for Echelon 1 delivery; this outward face is the piece of Echelon 0 that the post-DAQ world sees, and the defined point where Echelon 1 picks up the datataking stream, as STF files.

Echelon 1 comprises the two host laboratories, each providing buffer, archive, prompt processing, and fast monitoring, with jointly hosted services — Rucio data management, PanDA workload management, AI services, databases — spanning them. Raw data reaches both E1 sites (the butterfly model), with JLab fed over ESnet at 400 Gbps. The WFMS requirements state that the two E1s operate as one integrated distributed system with failover: if one E1 goes down, the other takes over. Two dataflows and the control messaging cross the boundary; they are described in the sections below.

The architecture in one view (the ePIC computing model diagram, July 2026):

The ePIC computing model

Data scale: roughly 2 Tb/s digitized at the detector against an output requirement of about 100 Gb/s recorded, with a maximum deep inelastic scattering rate of ~500 kHz against the 98.5 MHz bunch-crossing clock. Noise and backgrounds can dominate: synchrotron radiation in the silicon vertex tracker alone can approach 450 Gb/s into DAQ computing at the highest-luminosity 18 GeV running, and dRICH dark-current rates after radiation damage require a high-level filter. The DAQ group is correspondingly open to Echelon 0 or early Echelon 1 data reduction, including a software trigger — which makes the location where raw data is finalized itself a boundary question.

Echelon 0

The E0 side of the interface, from the DAQ overview at the July 2026 workfest:

  • Scale. About 30 detectors read out through ~2500 readout boards (RDOs), ~120 data aggregation boards (DAMs), and a global timing unit (GTU). Echelon 0 computing is O(100) readout computers in the DAQ room plus O(100) computers at the SDCC data center for time frame building, high-level filters, archiving, monitoring, logging, and QA.
  • Run-control model. The state model incorporates continuously running components (scalers are the example); a "run" structure configures and selects the enabled detectors; slow-controls status is part of the state model. This is the E0-side model that the E0-E1 state machine (below) converges with.
  • Data banks. Raw banks produced by the readout are formatted but never modified; processing — data reduction or enrichment — produces new banks; a fraction of raw banks is always retained. This is the provenance substrate at the data level.
  • Timing. ASICs report hit times against a synchronization signal; the DAQ-provided time function is measured in EIC bunch crossings relative to the time frame start, with per-detector functions mapping channel, clock cycle, and fine counter to a time value. Bunch-dependent polarization requires event data and luminosity monitoring resolved to the bunch crossing, for each of the 1260 bunches.
  • Timeline. Electronics and DAQ are working toward a final design review in early 2027. DAQ releases: PicoDAQ (FY26Q2, basic readout test setups), MicroDAQ (FY27Q1, engineering-article test stands, including Echelon 0 computing installed at SCDF), MiniDAQ (FY28Q1, full hardware and timing chain), Full DAQ-v1 (FY29Q2, ready for system integration), Production DAQ (FY31Q3, cosmics), against detector installation FY29Q2-FY31Q2. Neither PicoDAQ nor MicroDAQ has a direct interface between detector components and Echelon 1, but this does not prevent DAQ participation in interface test stands — for example implementing the DAQ side of transfer interfaces for the orchestration testbed.

Two E0 commitments bear directly on interface development. A DAQ proto-enclave at SDCC around the end of calendar 2026 — a few computers that can exercise the interface against testbeds of interest — and the prospect of making the E0-E1 interface part of DAQ proper, with run control and file sending, eventually replacing the testbed's DAQ simulator with a DAQ-owned simulator. That transfer would make the interface bilateral: each side owning and expressing its own half.

Data across the interface

Definitions. A time frame (TF) is the multiplexed data of the entire detector for 2^16 bunch crossings, approximately 0.665 ms, deliberately not synchronized to bunch 0 so that edge effects are decorrelated from spin states. All detectors are built into each TF. A super time frame (STF) is an ordered, contiguous set of O(1000) TFs — roughly 0.6 s of detector data, of order 2 GB — and is the unit of registration, transfer, bookkeeping, and bulk processing. TFs are not transmitted in isolation; the STF is what crosses the interface as a file.

A terminology hazard, flagged on the DAQ side: "time frame" is informally overloaded. MAPS integration periods (2-8 µs), the organizing unit of much simulation work, and ASIC synchronization periods are both also called time frames. The interface definition pins the term to the DAQ TF above; the other senses should be named distinctly in interface documents.

Independent DAQ systems. Polarimetry and luminosity detectors run as independent DAQ systems with their own STF streams (n×1260 values, presented infrequently and each second respectively) alongside the ePIC detector stream. Special-case streams copy into the main stream while retaining independent uses.

Two dataflows leave the exit buffer. The STF stream is the complete raw data: files registered in Rucio at the exit buffer and delivered to the E1 buffers at both sites; reliable, with latency of minutes. The TF stream is a fast subsample at finer granularity, delivered by messaging or direct XRootD reads against the exit buffer within seconds; it feeds fast monitoring and fast processing, and does not implement retention. The two flows serve different consumers and carry different completeness semantics; keeping those semantics distinct — what a consumer may infer from a fast-path sample versus a verified complete STF — is a formalization requirement.

A TF stream direct from DAQ to downstream consumers such as fast calibration is under discussion.

The WFMS requirements state further obligations at the boundary. Archiving and processing are triggered independently and simultaneously as data is ingested, with no possibility of processing blocking archiving. The complete copies arriving and archived at the two E1 centers are promptly validated, with a continuously communicated running checksum maintained between them, and the stream is continuously sampled and validated against independent DAQ and conditions metadata as an early alarm for corruption and stream faults.

The TF/STF picture in one view (figure maintained in the WFMS documentation):

Time frames and super time frames

Proto-STF exercise. The testbed has processed official ePIC DIS 10×100 timeframe simulation files through a real EICrecon payload (200 MB and 40 events per file without zero suppression, ~5 s/event) — prototyping the STF format question with real data. The format itself — zero suppression, file sizing toward the nominal 2 GB — remains open.

State across the interface

The datataking state model is a set of states and substates describing collider, detector, DAQ and calibration state, maintained in a database that is definitive in E0 and mirrored in real time in E1, and carried as operational metadata on the data and messages crossing the interface, in STF filenames/files and in the message metadata of every STF notification. Downstream consumers can read state from the datataking context of the data they are handling. They can read current system state from distributed services such as MCP (Model Context Protocol). Integration with the detector/data state machine is a stated WFMS requirement, as is always-on streaming: accelerator and detector information flows outside the running state, with processing suspending and resuming on state and stream activity, the behavior the data-flavor substates and steady state components carry.

The first version of the model runs in the streaming workflow testbed, which drives all activity via the state machine. The definition is maintained independently of the implementation in the E0-E1 state machine document, which also carries the proposed evolution: generalizing the (state, substate) pair to a global state incorporating the E0 run-control elements — detector participation and slow-controls status, with the DAQ model's continuously running components as steady state components — and treating state changes as events appended to a queryable state history. The global state across a datataking arc:

The E0-E1 global state

A multi-model AI research report (referenced below) carried the evolution further with a proposed factorized structure, judged of high enough quality to include here for consideration: the production state as a product of independently owned facets, with a single authority for each facet, an append-only transition history, and derived operational views (such as a physics-good flag) that are readable but not writable. The proposed facet set:

Facet Example states Authority
Machine/beam absent, injection, tuning, stable, lost Machine interface represented through E0
Run control idle, configuring, ready, starting, running, paused, stopping, closed, aborted E0 run control
Acquisition mode physics, dedicated calibration, embedded calibration, test E0 run configuration
Detector partition ready, acquiring, degraded, masked, fault E0 detector control
STF lifecycle forming through expired E0, Rucio, and each E1 for their stages
E1 transfer unknown, requested, transferring, verified, failed Named E1/Rucio components
E1 processing queued, running, completed, failed, cancelled Named E1 workflow system
Conditions candidate proposed, validating, approved, published, active, superseded, rejected Conditions and calibration authorities

In this model, only the owner changes a facet; consumers maintain projections updated by monotonically increasing revisions, with a mismatch triggering reconciliation rather than silent application. Each transition record carries its owner, subject, previous and new revision, transition type and reason, event and receipt times, configuration and schema versions, correlation and causation identifiers, actor identity, and a quality or confidence measure where the input is observational.

The single-hierarchy model in operation today cannot express common combinations — beam present with the DAQ paused, a physics run with one detector partition degraded, embedded calibration during normal acquisition — which the facet product represents naturally. The global-state proposal above is a step in this direction: detector participation and slow-controls status are early facets, and the steady state components are facets that persist across the run lifecycle.

Open items: the complete transition table with triggering conditions, event-driven transitions (a good-for-physics declaration, a fault dropping the detector out of physics), the interaction of state with the run boundary (a new run when the detector is in a new conditions state), the evaluation of the proposed facet model for the state machine definition, and the reconciliation with the DAQ run-control model in one document, which this document set begins.

Latency

Three latency regimes are identified, each with its consumers and its serving mechanism in the two-dataflow structure above:

  1. Bulk prompt processing: minutes (Rucio delivery time) to availability of complete STF files at the E1s, with prompt results over minutes to hours depending on processing load. Served by the STF stream.
  2. Fast path: 10-30 s from datataking to availability of STF-scale statistics for fresh data, delivered to the control room and AI via streaming processing at the E1s; the WFMS documentation states O(10 s) for first results. Served by the TF-sample stream.
  3. Very low latency: around one second and below — DAQ-internal, below the interface.

Behind these sits the streaming readout goal of reconstructed, calibrated data to the collaboration within about three weeks of datataking, with reconstruction turnaround driven by calibration turnaround. The calibration program adds its own latency classes — seconds (prompt feedback), minutes (run-by-run updates), hours (delayed or quasi-online) — to be mapped onto the two dataflows and the state model's calibration modes. The September 2026 formalization should state latencies with well defined endpoints: from what event (e.g. data egress from DAQ) to what event (a high stats plot displayed in the control room).

Calibration and conditions databases

The July 2026 calibration sessions produced a well structured requirements statement, with interface specifications as requirement number one, scoped explicitly as E0-E1 / E1-E2: what data is produced and consumed; calibration object format, metadata, versioning, validity intervals. Infrastructure requirements follow — conditions database, orchestration layer, possibly dedicated compute queues, monitoring and control interfaces — then workflow placement (at which DAQ stage each calibration runs; synchronous versus asynchronous), resource profiles, and an autonomous calibration framework.

The calibration task taxonomy: standalone (between fills, laser, pulser), physics-driven (track, vertex, and PID dependent), and iterative (requiring previous constants or reconstruction-calibration loops), with a dependency matrix and explicit identification of circular dependencies. Tracking is the prerequisite for many calibrations.

The conditions database splits by side: E0 needs conditions gathering, selective population, fast loading, and APIs to E0-only databases (raw conditions, slow controls); E1 needs a robust distributed read API for many clients and distributed writing for few. Its content spans calibration measurements, distilled slow-controls parameters, and alignment measurements. Whether this means one conditions database or two remains open, as does whether the conditions database is the mechanism for flowing downstream-refined calibrations back to E0. ePIC has not yet taken up the conditions database in software and computing; the intent is established, and the step awaits a use case that calls for it. A candidate is identified: nopayloaddb, the HSF reference conditions database implementation developed at BNL, which received a preliminary and favorable ePIC evaluation in 2024. The E0-versus-E1 placement of calibrations was judged in January to be sociological more than technical — with a good feedback loop there is no effective difference — with the firm constraint that detector experts require control wherever their calibration runs.

Concrete demonstrators are chosen. EEEMCal is the first testbed target: calibration workflow prototypes starting from a file-based Snakemake payload with a proto-interface to a calibration database, extending to fast processing. SVT alignment provides the second: ER2 MOSAIX sensors in a beam test at KEK PF-AR with NestDAQ, conversion to JANA2 over ZeroMQ, and alignment algorithms adapted from existing tools — an end-to-end streaming calibration workflow on real detector data.

SPINDLE (Streaming Physics INtelligence and Data Lifecycle Engine) is the JLab program: an HPDF nuclear physics use case built on online calibrations, with a five-stage lifecycle (monitoring, change detection, reconstruction and calibration, validation and change-driver analysis, calibration and conditions data with visualization) on autonomous ERSAP+JANA2 workflows. SPINDLE identifies streaming orchestration (workflow and workload management for streaming data) as the technology gap facing streaming readout experiments and HPDF alike; this is the capability the testbed program is building, and SPINDLE positions itself as complementary, with its data-lifecycle focus.

Information and control interfaces

E0 to E1 is operational today, in the testbed realization: the run lifecycle (run imminent, start, pause and resume, end) is broadcast from the DAQ simulator and drives downstream orchestration — dataset creation, data transfers, processing task establishment, worker provisioning, run closeout. STF availability notifications drive data handling.

E1 to E0 is the open direction. The use case is established — adjusting detector thresholds or configuration on the basis of an E1 result, with AI control of hardware operational precedent at JLab — but no E1-to-E0 control flow has been prototyped in ePIC. The January notes call for defining the generic communications mechanism (message queue, messages pointing to payloads, communicating servers on each side) rather than per-calibration specifics. Beyond the communication and information exchange mechanisms already in hand and exercised in the testbed, E1-to-E0 control is primarily a cybersecurity matter: too early to take up, and belonging more to the host facilities than to ePIC software and computing. It is likely to be addressed in a preliminary way when the DAQ sets up its first proto-enclave around the end of 2026.

The July 2026 AI research on the interface presents a proposal worth considering, organizing the formalization into five planes, a candidate outline for the September work:

  1. Data plane — immutable STFs for complete raw data, plus explicitly sampled TF slices for low-latency processing.
  2. Event plane — versioned lifecycle and availability events with stable identities, sequence numbers, timestamps, schema identifiers, and checksums.
  3. State plane — an authoritative, factorized state model with a single owner for each state facet and append-only transition history.
  4. Intent and control plane — recommendations and command intents from E1 to an E0-local gateway, with policy evaluation, approval, precondition checking, execution, and readback as separate stages.
  5. Provenance plane — every consequential result carries a trace from observation through recommendation, approval, policy decision, action, and measured outcome.

Of these, the data and state planes have concrete artifacts (above), and the event plane is the next definition target: the run lifecycle and availability messages exist in the testbed vocabulary, and the interface needs their contract — which changes are durable events, which authority emits each, and what consumers may assume about identity, ordering, completeness, and delivery. The intent/control and provenance planes frame the E1-to-E0 direction: control crosses as attributable intents subject to E0-local policy and enforcement, not as direct writes.

The event plane has had some discussion in the streaming computing model WG, in the context of developing the WFMS requirements document, but it needs dedicated discussion and a plan established, as it is an important part of the interface. The WFMS requirements carry the elements stated so far: workflows driven in real time by data-availability events, TF and bunch-crossing identifiers monotonically increasing and unique for the lifetime of the EIC, cataloged TF-to-bunch-crossing ranges so access at either granularity resolves to its containing TF, immutability of written TFs, and run-period records that may overlap, so a TF is not uniquely owned by one run period.

AI readiness and AI-enabled control

The July 2026 session recorded a consensus: no fundamental objection to MCP as the common basis for AI integration of services across the spectrum. The DAQ side has independently written down the same architecture in its AI requirements: AI is not a project requirement for the DAQ but a potentially very useful tool for attaining the project requirements, with the concrete AI-readiness list being specific ML algorithms for specific features (dRICH dark-current reduction in firmware), MCP servers making DAQ data accessible to large language models (slow controls readout, EIC controls readout, DAQ monitoring and logging, run log database), and MCP servers providing APIs through which LLMs could potentially control DAQ run-control features — citing the orchestration testbed as the model to follow.

On the E1 side this is deployed: the testbed operates a comprehensive MCP service over the full system state — runs, STFs, agents, workflows, logs, PanDA, Rucio — used for both information and control, with agents controllable equivalently from the CLI and from AI assistants. The MCP-based AI backplane spanning machine, DAQ, Echelon 1 and global computing (figure maintained with the MCP service documentation in swf-monitor):

The MCP-based AI backplane

The proposed AI contract of the interface classifies every AI interaction with the boundary as observation (reading through MCP), recommendation (a proposal record), approval (a human or policy gate), or action (logged, provenance-stamped execution). The vocabulary has operational precedent: the production side of the WFMS platform runs it today — an action stream recording who did what to what with outcome and provenance, AI proposals with human approval and deterministic execution, and button-gated credentialed operations. The research direction sharpens the boundary-grade version: MCP serves as a typed access layer over authoritative systems, tool exposure does not transfer authority, and authorization and safety enforcement remain with the local (E0) control system. Consequential detector action stays subject to local deterministic enforcement regardless of what proposes it.

The testbed realization

The streaming workflow testbed is the working expression of the interface: a simulated DAQ expresses the E0 side (run lifecycle, STF stream, state metadata), and the data, processing, and fast-monitoring agents express the E1 side, on real services — PanDA, Rucio, ActiveMQ, the monitor. Both baseline workflows run routinely, including in continuous integration:

  • Prompt STF processing: run-imminent creates the Rucio run dataset; arriving STFs are registered and attached; a PanDA task per E1 consumes its site's subset dataset as it fills. A decision box will encode ePIC and facility policy as Rucio dataset membership — the data agent at the exit buffer can examine each STF on arrival and attach it to BNL, JLab, both, or neither — so prompt processing is per-Echelon-1 by construction, and policy is informed by data, not only metadata-driven.
  • Fast TF processing: TF samples skimmed from STFs, divided into slices, distributed to a standing pool of persistent PanDA workers pre-provisioned at run start through iDDS and Harvester, running EICrecon as a persistent process fed over ZeroMQ with streaming input over XRootD.

State rides every STF message and filename, so downstream consumers and AI tools always know the datataking context of the data in hand. Containerized deployment (docker-compose of the testbed, PanDA in a box) makes the testbed reproducible beyond its home installation — directly relevant to exercising the interface against the DAQ proto-enclave.

Development targets

A time order is not implied.

  • September 2026 — formalize the interface in the current V3 draft Streaming Computing Model report; this document is one input to its writing.
  • State machine convergence — complete the transition table, add event-driven transitions, weigh the proposed factorized facet model, and reconcile the testbed model with the DAQ run-control model in the definition; realize the state database and its E1 mirror with a read API.
  • Event plane definition — specify the event contract for the run lifecycle and data availability vocabulary the testbed already operates.
  • Calibration — EEEMCal calibration prototype with a proto-interface to a calibration database; SVT alignment demonstrator; the nopayloaddb conversation; definition (and naming) of the generic intra-run communications mechanism.
  • E0 E1 integrated testing — exercise the interface against the DAQ proto-enclave at SDCC; prepare the testbed to swap its DAQ simulator for a DAQ-owned simulator.
  • Documentation — the WFMS documentation covers the datataking state machine, the status of the conditions database and of E1-to-E0 control; the AI contract of the boundary remains to be documented.

Producing this document

An AI (Anthropic Claude Fable 5, xhigh reasoning setting) was tasked with taking the references and artifacts cited below, and human guidance (T. Wenaus), as inputs and producing a draft of this document. Many human-AI iterations followed to refine the draft. When it was satisfactory, Wenaus went through the full draft and edited by hand.

Interface artifacts

The concrete artifacts of the interface definition, July 2026:

Sources